Source art
The Desalination Unit needed a wall that read as water-treatment equipment at game scale. The source art uses blue-green pipes, gauges, and filter housings. Its center stays clear so the game can draw a doorway as a separate piece.

Check the room in four rotations
The review board shows the authored layouts with the intake facing north, east, south, and west. The room needs a clear route through each of its three doors in every rotation. The checks covered all 12 door approaches and verified that the intake side could not be used as an entrance.

The finished room in-game
The finished room connects to the station through its doors and draws seawater from the open ocean. If a neighboring room blocks the intake, the inspector shows it and water production stops.

The open-source Shadewater Game Asset Pipeline shares the room-planning, source-tracking, and geometry-review practices behind work like this.
