Shadewater Labs/BrineSpace asset case study

CASE STUDY · BRINESPACE

How BrineSpace assets are made

Follow the Desalination Unit from its original wall art through four rotation checks to the finished room in BrineSpace.

Source art

The Desalination Unit needed a wall that read as water-treatment equipment at game scale. The source art uses blue-green pipes, gauges, and filter housings. Its center stays clear so the game can draw a doorway as a separate piece.

Water-treatment wall artwork with pipes and gauges flanking a plain center panel.
The original wall artwork, before it was prepared for the game.

Check the room in four rotations

The review board shows the authored layouts with the intake facing north, east, south, and west. The room needs a clear route through each of its three doors in every rotation. The checks covered all 12 door approaches and verified that the intake side could not be used as an entrance.

Four layouts show the intake pointing north, east, south, and west, with three door openings in each.
The development review board showing the four intake directions and door positions.
Open the full rotation board

The finished room in-game

The finished room connects to the station through its doors and draws seawater from the open ocean. If a neighboring room blocks the intake, the inspector shows it and water production stops.

The finished Desalination Unit selected in a BrineSpace station, with its inspector open.
The Desalination Unit in the Windows 0.4.0 RC1 preview.

The open-source Shadewater Game Asset Pipeline shares the room-planning, source-tracking, and geometry-review practices behind work like this.

More from the lab

The Festival Companion programme in dark mode, with day tabs, search, and the My Plan sidebar.

Futureproof Festival Companion & FishMail

See how festival attendees planned their day and sent notes through a shared aquarium.

Read the case study
Browse all case studies